Part of the escalation and installation of tubes (30) ing and (24) ing inside the pipe rak jpr1 and jpr2 at the North DGS gas insulation plant.
Part of the escalation and installation of tubes (30) ing and (24) ing inside the pipe rak jpr1 and jpr2 at the North DGS gas insulation plant.
It is our pleasure to put in your hands this brief introductory document about the activities and potentials of our company. We are sincerely interested to build business relationships on a firm ground of mutual trust.